- Removed the main starting valve with slow turn valve frommainengine
- Dismantled the main starting valve with slow turn valveincluding ball valve and actuator
- Cleaned each dismantled parts properly
- Visible checked each cleaned parts
- Reassembled themain starting valve
- Function test
- Installed the main starting valve with slow turn valve ontomainengine properly;
Check the engine condition prior to start
- Starting test in Local, ECR and Bridge includings low turn and air run function
- Monitoring of all signal values in CoCoS-EDS program
- Adiustment of fuel quality offset quality offset
- TachoFunction Test
- Adjustments on/through PMI PMI
Start/Operation the engine
- TDC calibration (requires extensive running of M/Eabove 50%MCR Load)
- Balancing of the engine, performance adjustments
- Test on different loads and performance evaluation

Copy product links
Long by picture save/share
